GEMINI PARKWAY EXTENSION

Columbus, Ohio

The extension will connect Gemini from its current dead end at Orion Place to the newly extended Worthington Road, with three planned connections south to Polaris Parkway along the way. The road will be four lanes – two each eastbound and westbound – from Orion to Worthington Road and will have new traffic signals, street lighting, and a shared-use path.

True Inspection Services provided inspection including structure inspection, concrete testing and inspection, asphalt inspection, and earthwork (excavation). TIS reviewed specifications, inspected construction of project structures including head walls, under drain installation, sanitary sewer trenching and pipe conduit placement, as well as storm sewer installation. Our inspector also verified compliance for safety, signing, and pavement marking and inspected and reported on landscape requirements and specs.