This project includes 4.35 miles of full depth pavement replacement, the addition of one lane in each direction in the median of I71, replacement of the I71 southbound ramp on-ramp and the I.R. 71 northbound off-ramp at the Stringtown Road interchange, the rehabilitation of structures over White Road, and the addition of noise walls. A proposed drainage system, guardrail, lighting and culverts will also be added.

True Inspection Services provided construction inspection and daily documentation of work performed by the contractors and material testing on the construction project.