NEW RAMP FROM 315 S. TO I-270 E. AND U.S. 23

Columbus, Ohio

The “loop ramp” from SR 315 south to I-270 east will be eliminated and a new “flyover ramp” is being constructed. There will also be a new bridge built for SR 315 north traffic that wants to go to I-270 east and U.S. 23. The new ramp from SR 315 north and south will be two lanes – one for traffic exiting at U.S. 23 and one for traffic staying on I-270 east. The combination of these new travel lanes means there will be less weaving and merging or “jockeying” for the same piece of pavement.

True Inspection Services provided construction inspection and daily documentation of work performed by the contractors and material testing on the construction project.