DISTRICT 6

Trench Project

Columbus, Ohio

I-270 at US 23

Modification of the existing cloverleaf interchange to a Partial Cloverleaf (Parclo) Type A interchange.

US 23 – From I-270 to Flint Rd.

Creation of a grade-separated, northbound-only roadway which by-passes the signals on US 23 between I-270 and Flint Rd. The grade separated roadway would be below normal grade, and located between the northbound and southbound “surface” roadways.

York Temple Drive

Relocation/extension of York Temple Dr. to access West Campus View Boulevard.

True Inspection Services specifically provided general coating and construction inspection on the 94,207 SF IZEU structure. Assisted with observations of the concrete coating system in the trench and MSE walls throughout the project. Also, helped with testing concrete and observing asphalt placement.